Yamaha YBR 125 Stator & Generator Quick Guide
The
Wiring: Includes 3 white wires (stator/charging), a blue wire (neutral switch), and red/white wires (crank sensor).
Static Test: Measure resistance between the white wires; it should be low and equal (approx. 0.5–1.5 Ω).
Ground Check: Ensure there is no continuity between any white wire and the engine casing.
Output: The system generates AC voltage that increases with RPM before being converted by the regulator.
Other posts of interest
How to test the Yamaha YBR 125 generator testing


No comments:
Post a Comment